Meeting Time: July 31, 2025 at 5:30pm PDT
The online Comment window has expired

Agenda Item

3. Project: Aliso School Kindergarten Building, Project #25-2329-DP/CDP/ARB Address: 4545 Carpinteria Ave Applicants: Jason Kaff, CUSD Assistant Superintendent Planner: Megan Musolf Request of Jonathan Leech, Dudek agent on behalf of Carpinteria Unified School District (CUSD), to consider Project #25-2329-DP/CDP/ARB for preliminary/final review of a proposed new kindergarten building. All seven portable classroom structures on the Aliso School campus would be removed and the proposed kindergarten building would replace the five portable classroom structures currently used for kindergarten instruction. The proposed building would be 6,467 square feet and would consist of four classrooms, one staff and five student restrooms, and a raised courtyard area. The maximum height of the new building would be 27 feet, 4 inches above finished grade. Existing playgrounds would remain. The adjacent parking area would be partially re-striped to accommodate ADA-compliant parking spaces and the required fire truck turning radius, resulting in a net loss of five spaces. New landscape and hardscape would be installed around the proposed building. The project site, Aliso School campus, is 7.79 acres, zoned Community Facility (CF) and is addressed as 4545 Carpinteria Avenue, APNs 003-230-011, 003-230-018, and 003-230-016.