1. Projects: Sandpiper MHP Solar Panels- Phase 1, Project 22-2167-DP/CDP and Sandpiper MHP Solar Panels- Phase 2, Project 22-2168-DP/CDP
Addresses: 3950 Via Real and 1315 Cravens Lane
Applicant: Steve Welton, agent, for Sandbar Solar
Planner: Syndi Souter
Request of Steve Welton, agent, for Sandbar Solar, to consider Projects 22-2167-DP/CDP (Phase 1) and 22-2168-DP/CDP (Phase 2) for preliminary review of a request for a two-phase solar panel installation. Phase 1 would include the installation of four new carport-style solar panel canopies and associated electrical support equipment. The canopies would range from 4,680- to 5,290-square feet in size, for a total of approximately 20,000 square-feet, and would have a maximum height of 14.75-feet. Phase 2 would include the installation of four new ground-mounted solar panel arrays and associated electrical support equipment. The arrays would be 2,926-square feet in size, for a total of approximately 11,700 square-feet, and would have a maximum height of 8.5-feet. The property is a 37.15-acre parcel zoned Mobile Home Park Planned Development (MRP) and shown as APNs 005-430-021 and -051, addressed as 3950 Via Real and 1315 Cravens Lane.